Our Team consist of Former Joint Commission Surveyors, Professional Facilities Managers, CAD Operators, Project Managers, Construction Experts , Facility Systems Specialists, and Life Safety Consultants
Specializing in regulatory compliance services for Joint Commission, DNV, ACHC, CMS, etc. Develop As-Built CAD drawings, Polylining, BIM Models, Space Utilization Studies, IWMS systems selection, system deployment, and IWMS project management, Damper Survey, Annual Door Survey and Maintenance, Project Management, Asset Inventory, HVAC Optimization and Energy Studies.
PROEDGE FM will be at the following upcoming trade shows and events.
ACHCU Academy: The Education Event for Health Care
March 2 – 4
The Omni Amelia Island Hotel
Amelia Island, FL
NEHES (New England Healthcare Engineers Society) Spring Seminar
April 3
DoubleTree by Hilton (Manchester Downtown)
Manchester, NH
ISHE (Indiana Society for Healthcare Engineering) Spring Conference
May 13 – 15
French Lick Resort
French Lick, IN
"They did and Excellent job for us on our fire damper inspection" - St. James Hospital
"We had a wonderful experience working with the PROEDGE FM Team on a recent opportunity" - ROI Consulting Group
We have in place partnerships with companies specializing in Building Information Management(BIM ) software, Geographic Information Systems(GIS), Integrated Workplace Management Systems(IWMS), Computerized Maintenance Management Systems(CMMS) and Construction Companies
Can you develop a BIM model for an existing building? Yes. Please provide details on Gross Square Footage, number of floors, location of building, etc
Are you able to provide PM Services for Facilities IT projects? We can provide Project Management services related to IWMS systems, CMMS Systems, Data Analytics, etc.
How long does it take to develop "As-Is" CAD drawings? Based on the type of building, accessibility to all the spaces, ability to work off hours, level of detail and level of accuracy. If you can provide us additional information, we can develop a detailed proposal and schedule.
Can you help us select a new CMMS System? We can work work with your IT and Facilities staff to develop a needs analysis which will include the type of system required, number of users, integrations into existing systems, etc. Please call us and we will be happy to help you develop an action plan. We can also help develop an RFP if one is required.